(904) 217-2520
ALANSY
Commercial Electric · Jacksonville

Data & Low-Voltage Install

Cat6A / fiber install, IDF / MDF buildout, access control and IP camera install, paging and A/V — pulled and terminated by the same crew that ran your power.

/ Scope

What's typically included

  • Structured cabling Cat6A and OM4 fiber
  • Access control and IP camera install
  • Paging, intercom, and A/V install
  • Test reports and as-built drawings
  • BICSI-aligned termination and labeling
  • Headend, rack, and IDF buildout
Self-perform
Our own crew on the install — not a sub.
Stamped drawings
FL PE on staff and consulting.
Closeout package
As-builts, test reports, O&M manuals.
Service Dispatch · Jacksonville, FL

Talk to an electrician.

Describe the scope — panel, switchgear, generator, lighting, EV — and we tell you what it takes and when we can be on site.

  • Office Mon–Fri 7AM–5PM · Service Dispatch
  • FL Unlimited Electrical · EC13007649
  • Duval County · St. Johns County · Clay County · Nassau County
/ Why people call

What it usually
looks like first.

Any one of these is reason enough to get us on site. Describe what you're seeing — we'll tell you on the phone whether it needs a truck today or a scheduled visit.

01

Dead zones where the access points were added later

Coverage gaps usually trace back to where cable could be pulled at the time, not to where the AP belonged. Fixing it is a pathway problem.

02

A new suite with no IDF to serve it

Runs past 100 meters need a closet, not a longer cable. Deciding that during rough-in costs a fraction of deciding it after the walls close.

03

Cameras and card readers nobody can service

Unlabeled cable at both ends turns a ten-minute repair into an afternoon of tracing. Re-labeling and documenting is a scheduled visit, not an emergency.

04

Cable that won't pass certification

Failed Cat6A links are usually termination or bend-radius damage. We test to the standard and show you the report either way.

05

Racks and headend moving during a build-out

Relocating live network gear needs a cutover plan and an after-hours window, both of which we run alongside the power work.

/ How the work runs

Four steps, in this order.

01

Walk the pathways first

Where cable can physically go decides the design: existing tray, core drills, plenum limits, and how far the runs actually are.

02

Pull with the power crew

Low-voltage goes in on the same rough-in as the branch circuits, separated to code. One contractor, one schedule, no hand-off gap.

03

Terminate and certify

Jacks, patch panels, and fiber terminated to BICSI practice, then every link tested with a certifier and the results saved per port.

04

Label, rack, document

Both ends labeled to a scheme you can read in five years, rack elevations and as-builts handed over with the test report.

WhereDuval County · St. Johns County · Clay County · Nassau County — dispatched from Jacksonville.Service area
Call (904) 217-2520