Healthcare
electrical.
Hospitals, ambulatory surgery centers, medical office buildings, and dialysis clinics — wired to NFPA 99. Essential electrical system design, life-safety branch, and a generator plant that meets the code transfer times.
Essential electrical systems done right.
Type 1 healthcare occupancies require three separate branches — life-safety, critical, and equipment. Each has different ATS transfer times and load requirements under NFPA 99 Chapter 6.
Illumination of means of egress, exit signs, fire alarm, and communication systems. Transfer within 10 seconds under NFPA 99 for Type 1.
Task illumination, receptacles, and fixed equipment for patient care areas. Circuit identification, isolated-ground receptacles, and ground-fault protection.
HVAC equipment serving patient care, elevators, and other major equipment. Larger loads, longer transfer time than life-safety.
Sized to carry all three branches simultaneously. NFPA 110 Level 1 performance, load-bank tested at commissioning and annually.
From service entrance
to patient room outlet.
Main switchgear, panelboards, and bus duct. ATS for each branch of the essential system.
Generac, Kohler, or Cummins. Sized, installed, and load-bank tested. Annual service contract available.
IG circuits in patient care areas per NFPA 99 for clean power to sensitive medical equipment.
Rough-in and termination for nurse call, code blue, intercom, and patient-entertainment systems.
Operating room lighting, exam room task lighting, and patient room controls. Dimming and circuiting per room type.
Semi-annual or quarterly IR scans, ATS testing, and generator PM — with written reports for accreditation documentation.
Healthcare electrical — complete.
- NFPA 99 essential electrical system design
- Life-safety, critical, and equipment branch wiring
- Generator sizing, install, and ATS
- Isolated-ground patient care receptacles
- Ground-fault protection for patient care circuits
- Nurse call and code-blue rough-in
- Operating room and procedure-room lighting
- Semi-annual IR and ATS test maintenance contract
- Stamped electrical drawings through FL PE
- Permit, inspection, and AHCA survey support
We know NFPA 99
before you hand us the drawings.
Occupancy classification, square footage, and whether you have an existing generator. We'll come back with scope questions and a rough number.
Schedule service in minutes.
Pick a time that works — no phone tag, no hold music. We confirm every booking within the hour.
- Available 24 / 7 including weekends
- Confirmation within 60 minutes
- Licensed & insured · Jacksonville FL