"Alansy took over a stalled medical TI from another EC and finished four weeks ahead of where we expected. Their PM ran the close-out punchlist before we even asked."

J. Foster, GC
Southside, Jacksonville

"We had a Saturday-night main breaker trip in a 12-story office building. Alansy had a tech on site in 38 minutes and we were back up before Monday open. Worth every dollar of the contract."

A. Reyes, Facilities Director
Downtown Jacksonville

"Service upgrade for our second location. They sequenced everything around our soft-open, finished the panel install overnight so we didn't lose service. Best EC we've worked with in the city."

D. Calloway, Restaurateur
Jacksonville Beach

"Annual switchgear PM with IR scans caught a hot lug we'd have lost a transformer on. Their report is the kind of paperwork I show ownership without explaining."

S. Whitcombe, Hotel GM
Ponte Vedra Beach

"Design-assist on a retail center — their team caught two coordination issues at shop-drawing that would have cost us in the field. They think like builders, not just installers."

B. Tran, Architect
San Marco, Jacksonville

"Our maintenance contract has paid for itself three times this year. Quarterly IR scans, real reports, real photos. No fluff."

M. Holcomb, Property Manager
Mandarin, Jacksonville

"Industrial distribution upgrade — three MCCs and a new 2000A service entrance. Alansy ran arc-flash labeling the same week. Clean work, on schedule, zero OSHA issues."

C. Navarro, Plant Manager
Westside, Jacksonville

"ASC project with a 100kW generator plant and full NFPA 99 essential system. They knew the code before we handed them the drawings. Inspection passed first time."

L. Huang, Healthcare PM
Orange Park, Clay County

"Two hundred-unit apartment community with EV charging in the parking structure. Alansy did the capacity study, pulled the permits, and turned it in on budget. Exactly what we needed."

T. Morrison, Developer
Nocatee, St. Johns

"Tier III colocation buildout. Dual-path 480V, UPS bypass, and a 750kW Cummins plant. They understood uptime requirements without us having to explain it twice."

R. Castillo, Data Center Ops