(904) 217-2520
ALANSY
Commercial Electric · Jacksonville
/ Clay County, FL · 32068

EV charging install in
Middleburg.

Charging for the light-industrial and distribution properties along SR-21 and Old Jennings Road, plus the retail and service businesses filling the corridor. Clay Electric territory and Clay County permitting — a different utility conversation than anything on the Jacksonville side of the county line.

Clay Electric
Serving utility in most of 32068
Clay County
Permit authority, Green Cove Springs
32068
ZIP code covered
Three-phase
The question that decides DC fast
/ What's different here

Middleburg is not
a generic site.

The charger is the same everywhere. What changes from one city to the next is the utility, the permit desk, and what the buildings were wired for. That is most of the schedule and most of the cost.

UtilityClay Electric Cooperative
PermitsClay County Building Division, Green Cove Springs
Travel40–50 minutes on Blanding Boulevard
01

Three-phase availability decides the whole project

DC fast charging needs three-phase power. Along the SR-21 corridor that is usually a short conversation; off the corridor it can mean a transformer and a co-op work order with its own lead time. We ask this question first, before anyone picks hardware.

02

Clay Electric, not JEA

Most of 32068 is served by Clay Electric Cooperative, and a co-op runs its own process for new service and upgrades. We've worked it for years; it is not the JEA process with a different logo on it.

03

Lot sizes make the trench the line item

Properties out here are large, and the distance from the electrical room to where trucks or customers park is measured in hundreds of feet. Trenching and conductor size, not the charger, is where the money goes.

04

Fleet yards charge overnight, not on demand

Distribution and service-fleet properties along Old Jennings don't need fast charging — they need enough Level 2 to fill every vehicle between the last route and the first. That specification is cheaper and it lands on a smaller service.

/ What we charge in Middleburg

Properties we
wire for charging.

  • Light industrial and distribution properties
  • Service-fleet and contractor yards
  • Retail and restaurant parking on SR-21
  • Offices and clinics along Blanding Boulevard
  • Apartment and multifamily parking
/ Included on every install

Same scope,
wherever the site is.

  • Site capacity and demand study
  • Charger selection and procurement
  • Permit, inspection, and utility coordination
  • Underground conduit and trenching
  • Bollard, parking stops, and signage
  • Dedicated breaker and panel modification
  • Charger commissioning and network activation
  • Annual service and firmware maintenance
Charger types, process, and platforms
/ Get a bid for Middleburg

Site address
and port count.

That is enough to start. We pull the service size, check what Clay Electric Cooperative can deliver at the address, and come back with a demand study, a permit timeline, and a rough number.

Call or submit the form
(904) 217-2520
Service Dispatch · Jacksonville, FL

Talk to an electrician.

Describe the scope — panel, switchgear, generator, lighting, EV — and we tell you what it takes and when we can be on site.

  • Office Mon–Fri 7AM–5PM · Service Dispatch
  • FL Unlimited Electrical · EC13007649
  • Duval County · St. Johns County · Clay County · Nassau County
Call (904) 217-2520